Operations Manual Aoc

Operations Manual Aoc 4,5/5 7122 reviews

Reference: Reg. (EU) 965/2012, Article 2:‘“commercial operation” shall mean any operation of an aircraft, in return for remuneration or other valuable consideration, which is available to the public or, when not made available to the public, which is performed under a contract between an operator and a customer, where the latter has no control over the operator.’Pursuant to Article 140(2)(a) of Regulation (EU) 2018/1139 (the New Basic Regulation), ‘commercial operation’ shall still be understood as a reference to point (i) of Article 3 of Regulation (EC) No 216/2008. This is a transitional provision until not later than 12 September 2023, when the implementing rules adopted on the basis of Regulations (EC) No 216/2008 and (EC) No 552/2004 shall be adapted to this Regulation.

Build complete virtual sets and 3D graphics for broadcasting with Viz Artist, a real time TV software product from Vizrt. Click here to learn more. Designers and media houses will harness the power of free Viz Artist to expand. World-class graphics for everyone; Vizrt gives away Viz Artist design software. Viz artist software. Vizrt's advanced real-time design platform, Viz Artist, is now free for creatives around the world. The free Viz Artist unleashes the creativity of designers to model. Vizrt short for Visualization in Real-Time or Visual Artist, is a Norwegian company that creates. Vizrt's Viz Virtual Studio software and Viz Engine renderer were an integral part of the success of the first remote “holographic” live interviews.

  1. Aoc Computer Monitor Manual

The same definition of ‘commercial operation’ has already been transposed in Article 2 of Reg. (EU) No 965/2012 on air operations and is applicable as of 9 July 2019. Reference: CS-25 (Large Aeroplanes)Baby bassinets are currently included in a certification process of the particular aircraft in which they will be installed; baby bassinets are not certified as a separate device and they are not certified for taxi, take-off, landing and turbulent weather conditions. Placards advising on their stowage during taxi, take-off, landing and turbulence are required either at the location where baby bassinets will be fixed to the aircraft structure (e.g.

Da3200

Bulkhead) or a clearly visible instruction advising on the same must be in place on the baby bassinet itself.Because of the standard fixation of the unit, they are not stable during turbulence, they may swing up and down, and therefore they must be stowed during turbulence.The placarding requirements are related to the general certification requirements on placarding and intended function in accordance with Certifications Specifications and Acceptable Means of Compliance for Large Aeroplanes CS-25 and the marking requirements as specified in the approval of the equipment. The applicable reference paragraph is CS 25.1301, 25.1541.

There is no specific mention of baby bassinets, however, equipment installed in an aircraft must meet the applicable requirements of the certification basis, the equipment specifications (if available) or aircraft manufacturer specifications (if available), or NAA requirements applicable to the operation of the aircraft.For any questions on certification matters, do not hesitate to contact EASA Certification directorate. Reference: Regulation (EU) 2018/1139, Regulation (EU) No 965/2012 on Air OperationsEssential requirements are high-level safety objectives and obligations put on persons and organisations undertaking aviation activities under Regulation (EU) 2018/1139 (the Basic Regulation). Detailed rules are then adopted by the European Commission based on technical advice from EASA to further detail how to achieve these objectives and obligations. For example, the implementing rules for air operations (i.e.

Reference: Regulation (EU) No 1178/2011, Regulation (EU) No 965/2012These terms refer to certain legal concepts used in aviation safety regulations, in particular Reg. (EU) No 1178/2011 on aircrew and Reg. (EU) No 965/2012 on air operations.' Grandfathering' designates the legal recognition and acceptance of certificates issued on the basis of national legislation by national authorities prior to the entry into force of a specific regulation. For example, in Reg. (EU) No 1178/2011, the conditions for the grandfathering of JAR-compliant and non-JAR-compliant pilot licences and medical certificates are set forth in its Articles 4 and 5.

(EU) No 965/2012, the conditions for grandfathering of EU-OPS AOCs are set forth in Article 7(1).Grandfathering measures are included in the Cover Regulation to assist Member States in the transition from national rules to unified EU rules. In the case of aircrew licensing, provisions on grandfathering consider some national certificates issued in compliance with given regulations and by a certain date as being in compliance with the new Aircrew Regulation (i.e. (EU) No 1178/2011).A 'transition measure' is a provision helping the national competent authorities and regulated entities to gradually adapt to the new EU rules. Several examples can be found in the Aircrew Regulation, such as in Article 11c (in relation to the obligation of Member States regarding the transfer of records and certification processes of those organisations for which the Agency is the competent authority) and in Article 4 (1) — the obligation of Member States to adapt grandfathered pilot licences to the new format by a certain date.The 'opt-out' is a form of transition measure applicable to Member States. Opt-out provisions allowed Member States to decide not to implement an EU regulation or certain provisions thereof for a certain period of time, delaying the date of application of the new regulation (or certain provisions thereof) within that Member State. For example, the opt-out provisions contained in the Aircrew and Air Ops regulations required the Member State to notify the European Commission and EASA of the 'opt-out', describing the reasons for such derogation and the programme for the phasing out of the opt-out and achieving full implementation of the common requirements.Read more on.

Aoc Computer Monitor Manual

Many Commission Regulations adopted in EASA domains contain two different dates, usually under the heading “entry into force”. The example below is from Regulation (EU) No 965/2012 on air operations:Article 10Entry into force1.

This Regulation shall enter into force on the third day following that of its publication in the Official Journal of the European Union.It shall apply from 28 October 2012.The entry into force of an EU regulation represents the date when the regulation has legal existence in the EU legal order and in the national legal order of each Member State.It is common practice that the regulation enters into force 20 days after its publication in the Official Journal of the EU. Reference: Regulation (EU) No 965/2012 on Air Operations and its amendmentsRegulation (EU) No 965/2012 entered into force on 28 October 2012.Article 10 of the Air OPS Regulation includes an opt-out provision allowing Member States to postpone the applicability of Annexes I to V until 28 October 2014. This means that entire Annexes and/or specific parts of the Annexes will not be applicable if a Member States chooses to opt-out. Reference: Regulation (EU) No 965/2012 on Air Operations, associated Decisions (AMC/GM)EU-OPS was the basis for the creation of Regulation (EU) No 965/2012 on air operations, which is the currently applicable regulation in the field of air operations with aeroplanes and helicopters.EU-OPS is published in the Official Journal of the EU as of 20 August 2008 amending Council Regulation (EEC) No 3922/91 as regards common technical requirements and administrative procedures applicable to commercial transportation by aeroplane. Implementing rules (IRs) are binding in their entirety and used to specify a high and uniform level of safety and uniform conformity and compliance.

They detail how to comply with the essential requirements of the Basic Regulation and regulate the subject matters included in its scope. The IRs are adopted by the European Commission in the form of Regulations. EU law is directly applicable (full part of Member States' legal order).Detailed implementation aspects are included as Certification Specifications (CS) or Acceptable Means of Compliance (AMC).Acceptable Means of Compliance (AMC) are non-binding. The AMC serves as a means by which the requirements contained in the Basic Regulation and the IRs can be met. The AMC illustrate a means, but not the only means, by which a requirement of an implementing rule can be met. Satisfactory demonstration of compliance using a published AMC shall provide for presumption of compliance with the related requirement; it is a way to facilitate certification tasks for the applicant and the competent authority. However, NAAs and organisations may decide to show compliance with the requirements using other means. Both NAAs and the organisations may propose alternative means of compliance (AltMoCs).

‘Alternative Means of Compliance’ are those that propose an alternative to an existing AMC. Those AltMoC proposals must be accompanied by evidence of their ability to meet the intent of the IR. Use of an existing AMC gives the user the benefit of compliance with the IR.Read more on the difference between.Certification Specifications (CS) are non-binding technical standards adopted by EASA to meet the essential requirements of the Basic Regulation. CSs are used to establish the certification basis (CB) as described below. Should an aerodrome operator not meet the recommendation of the CS, they may propose an Equivalent Level of Safety (ELOS) that demonstrates how they meet the intent of the CS. As part of an agreed CB, the CS become binding on an individual basis to the applicant.Special Conditions (SC) are non-binding special detailed technical specifications determined by the NAA for an aerodrome if the certification specifications established by EASA are not adequate or are inappropriate to ensure conformity of the aerodrome with the essential requirements of Annex VII to the Basic Regulation.

Such inadequacy or inappropriateness may be due to:. the design features of the aerodrome; or. where experience in the operation of that or other aerodromes, having similar design features, has shown that safety may be compromised.SCs, like CSs, become binding on an individual basis to the applicant as part of an agreed CB.Guidance Material (GM) is non-binding explanatory and interpretation material on how to achieve the requirements contained in the Basic Regulation, the IRs, the AMCs and the CSs. It contains information, including examples, to assist the user in the correct understanding and application of the Basic Regulation, its IRs, AMCs and the CSs.Frequently Asked Questions: FAQs are published on the EASA website and cover a wide range of material.

Although the information contained in the FAQs is a summary of existing law or procedures, it may contain the results of a more complex interpretation of IR or other rules of law. In such cases there is always an internal quality consultation within the Agency prior to the publication of the FAQ on the website.

The EASA FAQs are necessary to share information and enable to get a common understanding.The FAQs are not additional GM. References: Regulation (EU) No 965/2012 on air operations as amended by Regulation (EU) No 800/2013; Reg. (EC) No 216/2008Yes, non-commercial operations with aeroplanes and helicopters are covered by Reg. (EU) No 965/2012 on air operations. The applicable rules are determined by the complexity of the aircraft being used: Annex VI (Part–NCC) applies to non-commercial operations with complex motor-powered aircraft) and Annex VII (Part–NCO) applies to non-commercial operations with other-than-complex motor-powered aircraft.The definition of complex motor-powered aircraft is found in Article 3 of Reg.

(EC) No 216/2008. Pursuant to Article 140(2)(a) of Regulation (EU) 2018/1139 (the New Basic Regulation), ‘complex motor-powered aircraft’ shall still be understood as a reference to point (j) of Article 3 of Regulation (EC) No 216/2008. This is a transitional provision until not later than 12 September 2023, when the implementing rules adopted on the basis of Regulations (EC) No 216/2008 and (EC) No 552/2004 shall be adapted to this Regulation. Reference: Regulation (EU) No 965/2012 on Air Operations and the associated DecisionsThis is determined by the nature of your flight, and in the case of non-commercial operations, by the type of aircraft used. The following diagram indicates under which requirements your flight should be operating.Commercial operationsCommercial air transport (CAT) operationsTechnical rules: Part-CATOperator rules: Part-OROSpecialised operations (aerial work)Technical rules: Part-SPOOperator rules: Part-ORONon-commercial operationsNon-commercial operations other than SPO(e.g. Business/corporate flights, leisure flights, private flights, training flights)With CMPA:Technical rules: Part-NCCOperator rules: Part-OROWith Ot-CMPA:Technical rules: Part-NCOSpecialised operations(aerial work)With CMPA:Technical rules: Part-SPOOperator rules: Part-OROWith Ot-CMPATechnical rules: Part-NCOPart-SPA (specific approvals) appl ies to all types of operations, as the case may be.CMPA = complex motor-powered aircraftOt-CMPA = other-than complex motor-powered aircraft.

Reference: Regulation (EU) No 965/2012 on Air Operations, associated Decisions (AMC/GM)The Agency has published a cross-reference table to assist industry in transitioning to the new rules.

Posted on